09 March 2021
Potsdam City Palace
Gilding of the putti, flagged staircase, 2020
Afterperception of nine putti in model clay. In style and time of the “old masters”. Carving out of the different characters, anatomies and positions of the putti. Silicone mold building and cast in stucco plaster for the cast-bronze. Double gilding of the bronze putti with pure gold leaf 24 carat on oil. In collaboration with Oleg Bessonov and Jacob Dierichs.
Client: Association Potsdam City Palace, represented through W. Goepel, Dr. Kuke and D. Pohlig.